Everyday Play

Case Study

Kings Hill Primary

Location

 
Kings Hill, Kent

Completed

2023

A little about this project

We love the fact that this project enquiry came from the Headteacher at Kings Hill having seen our work at another school in their area. We worked with the school’s team to come up with a design to their budget and ideas for what the children at their setting would enjoy and benefit from. Their wish list was long, but we made it all happen for them with a water wall, a play tower, a boat with climbing net and slide, an amphitheatre, a mud kitchen, a play den, a sandpit, water table, seating and storage. We needed a holiday after installing it all! We installed all the equipment for Kings Hill during term time because the children has another area within the grounds to play in whilst we worked. It was lovely to see their interest and excitement as the project progressed. We were challenged as we worked, by snow falling and also by the grounds we were installing on having a poor drainage set up. We soon rectified the issue of drainage by clearing the existing drains and adding extra Acco drain systems, but we couldn’t do much about the weather so we pushed on through it, keeping warm with extra layers of clothing and by keeping busy! We were kindly invited to the school’s grand opening of their new play area, where we meet the lovely Mayor of Tonbridge and Malling, Sue Bell. There was a school band, cake (we love cake) and many big smiles!

Testimonials